The usual run of things looks like this. Someone does the design. Someone else gets the quotes in. A third builds. A fourth delivers the furniture, eventually, in two part deliveries. Not one of them has ever held the whole flat in their head at the same time.
You know the result. The floor is good, the kitchen is good, and between the two sits a joint nobody planned, because it fell between two contracts. The joiner says the screed was not level. The screed layer says he never got the measurement. Both are right.
Where it actually goes wrong
After ten years I can list the places where projects come apart. It is always the same four.
- Between design and quote. What has been drawn has to be specified by someone who understood the drawing. Otherwise the cheapest thing that matches the wording gets offered, and the design is gone before a single wall is touched.
- Between two trades. The electrician and the joiner meet exactly once, at the back wall of the kitchen. If nobody is standing there who knows both drawings, the socket ends up behind the tall unit.
- Between building and furniture. A room that is structurally finished is not yet a room. Plan the furnishing only at that point and you plan with what happens to be in stock, not with what fits.
- At the very end. The last five per cent, curtains, light, handles, door stops, are the part people actually see. They are almost always handed back to the client, with a cheerful you will do that better yourselves.
How we do it
I draw, I specify, I stand on site and I hang the curtains. Not because I am better at all of it, but because the handovers fall away. Between my drawing and my order there is no misunderstanding, because both come from the same person.
Anything that touches the structure or the services is drawn and signed off by the trades who carry it out. That is not a retreat, it is how the law is built in Austria, and it is right. I bring the people together, I hold the thread, and I do not sign for anything I cannot answer for.
What it costs and what it saves
Working this way costs a fee, ten per cent of the building sum. In return it saves the two items that appear in no quotation. One is the extra work that comes from having to do something twice. The other is your time.
A conversion with four trades and a three month programme throws up roughly two hundred decisions. Which screw, which tone, how deep the niche, how high the socket. Anyone coordinating that themselves makes those decisions in the evening after work, with half the information and nothing to compare against. You can see it in the result.
The sentence I hear most often
It goes, we could have done that ourselves. Often true. The question is only whether you still care about the colour of the curtains after the third delayed delivery. That is exactly where it is decided whether a flat gets finished or merely becomes fit to move into.